La Jacinta

Photovoltaic Plant

Salto Department / Uruguay
Peak Power: 65.00 MWp
Annual Production:102,735 MWh/Year
CO2 Avoided:71,915 t/Year
Households Supplied: 34,245 Homes
Surface: 150.00 Hectares
Operation Date: 2015
System Type:Fixed Sructure
Project Status: In Operation
Plant Owner: Third Party
FRV Role:
  • Development
  • Financing
  • Construction
  • AM
  • O&M

Javier Esquivias

General Deputy Director, Elecnor

They are always a step ahead, and not just in the technical aspect. In addition, they have always been very rigorous and reliable. When they commit to a project, they always go all the way to the end.

Javier Esquivias

General Deputy Director, Elecnor

FRV has always been a pioneer. From the first time they came to us 10 years ago, they really made an impact with their vision and La Magascona, which was a project of a huge magnitude at that time.

Gianfranco Carassale

Lead Investment Officer, Inter-American Investment Corporation (IIC)

Despite their size, they have been competing closely in bids with firms, which had different structures and abilities. This certainly shows their ability to be a strong market competitor. FRV has been a pioneer in market segments where no one had been before, and that has a lot of value.