Photovoltaic Plant

Tirana Oeste

Tarapacá / Chile

Summary

Located in Chile, the 371 MW Tirana Oeste hybrid plant has received admission for the environmental impact study in February 2022

With a nominal power of 371 MW peak power and 159 MW in battery storage, Tirana Oeste is located in the region of Tarapacá, Chile. The project will cover an area of 655 hectares.

The project consists of the construction and operation of a photovoltaic module plant for the generation of electricity and battery energy storage blocks system (BESS).

Overview

250 MW DC
Peak Power
Tarapacá / Chile
Location
1 107 000 MWH/year
Annual production
655 Hectares
Surface
554 000 t/year
CO2 Avoided
136 954
Households supplied
2027
Operation date
PPAs
Project status