Yuba City Wastewater Treatment Plant

Photovoltaic Plant

Yuba City, California / USA
Peak Power: 0.80 MWp
Annual Production:439 MWh/Year
CO2 Avoided:307 t/Year
Households Supplied: 55 Homes
Surface: 1.62 Hectares
Operation Date: 2007
System Type:Single Axis Tracker. Sanyo Modules. SatCon Inverters
Project Status: In Operation
Plant Owner: Third Party
FRV Role:
  • Development
  • Sale

Javier Esquivias

General Deputy Director, Elecnor

FRV has always been a pioneer. From the first time they came to us 10 years ago, they really made an impact with their vision and La Magascona, which was a project of a huge magnitude at that time.

José Benjumea

Founder, FRV

We believe that our success needs to have a positive impact in those regions where we operate and that education is the best channel to meet this goal, and to improving the future of those communities that embrace our projects

Javier Esquivias

General Deputy Director, Elecnor

They are always a step ahead, and not just in the technical aspect. In addition, they have always been very rigorous and reliable. When they commit to a project, they always go all the way to the end.