Yuba City Wastewater Treatment Plant

Photovoltaic Plant

Yuba City, California / USA
Peak Power: 0.80 MWp
Annual Production:439 MWh/Year
CO2 Avoided:307 t/Year
Households Supplied: 55 Homes
Surface: 1.62 Hectares
Operation Date: 2007
System Type:Single Axis Tracker. Sanyo Modules. SatCon Inverters
Project Status: In Operation
Plant Owner: Third Party
FRV Role:
  • Development
  • Sale

Javier Esquivias

General Deputy Director, Elecnor

They are always a step ahead, and not just in the technical aspect. In addition, they have always been very rigorous and reliable. When they commit to a project, they always go all the way to the end.

Javier Esquivias

General Deputy Director, Elecnor

FRV has always been a pioneer. From the first time they came to us 10 years ago, they really made an impact with their vision and La Magascona, which was a project of a huge magnitude at that time.

Fernando Salinas

Country Manager at Central America Region, FRV

Collectively, we have a target to generate an important project pipeline that could help us achieving our company goals in the region.