University of California

Photovoltaic Plant

San Francisco, California / USA
Peak Power: 0.28 MWp
Annual Production:334 MWh/Year
CO2 Avoided:234 t/Year
Households Supplied: 42 Homes
Surface: 0.20 Hectares
Operation Date: 2007
System Type:Roof & Carport Installations. Fixed Structure. Various Tilts. Sharp and Unisolar modules. Xantrex and PV Powered Inverters
Project Status: In Operation
Plant Owner: Third Party
FRV Role:
  • Development
  • Sale

Marko Kremer

Senior Director, DIF Australia

FRV’s main strength is its ability to develop all processes internally. This provides the knowledge and capacity to anticipate what will happen and explain it clearly.

Javier Esquivias

General Deputy Director, Elecnor

FRV has always been a pioneer. From the first time they came to us 10 years ago, they really made an impact with their vision and La Magascona, which was a project of a huge magnitude at that time.

Fernando Salinas

Country Manager at Central America Region, FRV

After nine years working in FRV, I have significantly grown not only professionally but also personally. Living in four different countries and performing a wide range of activities will certainly have a positive impact in whatever activities I perform in the future.