Santa Rosa City Schools

Photovoltaic Plant

Santa Rosa, California / USA
Peak Power: 0.83 MWp
Annual Production:1,178 MWh/Year
CO2 Avoided:824 t/Year
Households Supplied: 147 Homes
Surface: 0.79 Hectares
Operation Date: 2008
System Type:Roof Installation. Fixed Structure. Various Tilts. Schott and Suntech Modules. Advanced Energy, Xantrex, PV Powered inverters
Project Status: In Operation
Plant Owner: Third Party
FRV Role:
  • Development
  • Sale

Rafael Benjumea

Founder, FRV

At FRV we have a strong commitment to the economic and social development of the markets and communities in which we operate, and we are pleased to be able to deliver on this commitment through this innovative program.

Gianfranco Carassale

Lead Investment Officer, Inter-American Investment Corporation (IIC)

Despite their size, they have been competing closely in bids with firms, which had different structures and abilities. This certainly shows their ability to be a strong market competitor. FRV has been a pioneer in market segments where no one had been before, and that has a lot of value.

José Benjumea

Founder, FRV

We believe that our success needs to have a positive impact in those regions where we operate and that education is the best channel to meet this goal, and to improving the future of those communities that embrace our projects