Happy Valley School

Photovoltaic Plant

Anderson, California / USA
Peak Power: 0.25 MWp
Annual Production:371 MWh/Year
CO2 Avoided:260 t/Year
Households Supplied: 46 Homes
Surface: 0.46 Hectares
Operation Date: 2007
System Type:Roof Installation. Fixed Filt Array 10º. Sharp Modules. SatCon Inverters
Project Status: In Operation
Plant Owner: Third Party
FRV Role:
  • Development
  • Sale

Fernando Salinas

Country Manager at Central America Region, FRV

After nine years working in FRV, I have significantly grown not only professionally but also personally. Living in four different countries and performing a wide range of activities will certainly have a positive impact in whatever activities I perform in the future.

Javier Esquivias

General Deputy Director, Elecnor

They are always a step ahead, and not just in the technical aspect. In addition, they have always been very rigorous and reliable. When they commit to a project, they always go all the way to the end.

José Benjumea

Founder, FRV

Everything has to change to stay the same. Energy has to be accessible, clean and sustainable, but if it is not affordable, the change will never come.