Extremadura Solar

Photovoltaic Plant

Extremadura / Spain
Peak Power: 57.50 MWp
Annual Production:107,313 MWh/Year
CO2 Avoided:75,119 t/Year
Households Supplied: 35,771 Homes
Surface: 235.80 Hectares
Operation Date: 2010
Project Status: In Operation
Plant Owner: Third Party
FRV Role:
  • Development
  • Financing
  • Construction
  • Sale

Javier Esquivias

General Deputy Director, Elecnor

FRV has always been a pioneer. From the first time they came to us 10 years ago, they really made an impact with their vision and La Magascona, which was a project of a huge magnitude at that time.

José Benjumea

Founder, FRV

Everything has to change to stay the same. Energy has to be accessible, clean and sustainable, but if it is not affordable, the change will never come.

Scott Mackin

Managing Partner and Co-President, Denham Capital

We’ve greatly enjoyed our collaborative relationship with the team and look forward to seeing FRV continue its success in the future.