Denver International Airport

Photovoltaic Plant

Denver, Colorado / USA
Peak Power: 2.00 MWp
Annual Production:3,000 MWh/Year
CO2 Avoided:2,100 t/Year
Households Supplied: 375 Homes
Surface: 3.06 Hectares
Operation Date: 2008
System Type:Single-axis Tracker. Sharp Modules. Xantrex Inverters
Project Status: In Operation
Plant Owner: Third Party
FRV Role:
  • Development
  • Sale

Javier Esquivias

General Deputy Director, Elecnor

FRV has always been a pioneer. From the first time they came to us 10 years ago, they really made an impact with their vision and La Magascona, which was a project of a huge magnitude at that time.

Rafael Benjumea

Founder, FRV

At FRV we have a strong commitment to the economic and social development of the markets and communities in which we operate, and we are pleased to be able to deliver on this commitment through this innovative program.

Gianfranco Carassale

Lead Investment Officer, Inter-American Investment Corporation (IIC)

Despite their size, they have been competing closely in bids with firms, which had different structures and abilities. This certainly shows their ability to be a strong market competitor. FRV has been a pioneer in market segments where no one had been before, and that has a lot of value.