Andhra Pradesh

Photovoltaic Plant

Andhra Pradesh / India
Peak Power: 138.00 MWp
Annual Production:238,000 MWh/Year
CO2 Avoided:190,000 t/Year
Households Supplied: 35,000 Homes
Surface: 100.00 Hectares
Operation Date: 2017
System Type:Fixed Tilt
Project Status: In Operation
Plant Owner: FRV
FRV Role:
  • Development
  • Financing
  • Construction

“The following Summary of Investment Information (SII) and Environmental and Social Review Summary (ESRS) is disclosed in accordance with IFC’s Access to Information Policy (AIP) that went into effect on January 1, 2012. Details for the proposed transaction can also be accessed at IFC website”.

José Benjumea

Founder, FRV

We believe that our success needs to have a positive impact in those regions where we operate and that education is the best channel to meet this goal, and to improving the future of those communities that embrace our projects

Fernando Salinas

Country Manager at Central America Region, FRV

Collectively, we have a target to generate an important project pipeline that could help us achieving our company goals in the region.

Javier Esquivias

General Deputy Director, Elecnor

They are always a step ahead, and not just in the technical aspect. In addition, they have always been very rigorous and reliable. When they commit to a project, they always go all the way to the end.